Banff Links Caravan Park Bridge - Ref 4568
Completed 6 days ahead of schedule this 2 span hardwood footbridge was the result of excellent teamwork between CTS Bridges and their client (Aberdeenshire Council), the foundation contractors and the caravan park owners.
The two span ekki hardwood bridge is right next to the North Sea so a durable option with minimal maintenance was requested by Aberdeenshire Council for a bridge at Banff Links Caravan Park.
The bridge was to sit onto existing foundations so CTS's engineer Simon Newby designed a galvanised steel bearing support bracket to form a saddle over the top of the existing concrete pier. This enabled the two span bridge to seamlessly meet to form a 14m Overall length of bridge.
Published: Tuesday, 27th August 2019 at 12:05pm