Cefni; Boardwalk and Footbridges
The 120m x 2m boardwalk formed part of a scheme consisting of a series of bridges and boardwalks.
The boardwalk was constructed from a steel frame with oak fascia, type C cross rail parapets and Hi Grip Standard grooved Oak deck.
A series of steel braced frames formed the substructure.
Dimensions
Length; 120m
Width; 2m
Client
Thyssen Construction
Location
Cefni Reservoir